The coutyard hasn't changed much lately. The columns for the main lobby have been poured and are located on the right side of the wall seperating phase 1 from phase 2. You can also see the strip in between both buildings. That has to be poured later after the other concrete has had a chance to cure all of the way. It will be poured after the 2nd floor is completed.
The coutyard hasn't changed much lately. The columns for the main lobby have been poured and are located on the right side of the wall seperating phase 1 from phase 2. You can also see the strip in between both buildings. That has to be poured later after the other concrete has had a chance to cure all of the way. It will be poured after the 2nd floor is completed.