  1. The coutyard hasn't changed much lately. The columns for the main lobby have been poured and are located on the right side of the wall seperating phase 1 from phase 2. You can also see the strip in between both buildings. That has to be poured later after the other concrete has had a chance to cure all of the way. It will be poured after the 2nd floor is completed.