Construction Photos Phase II - May, 2012























1 comment:

  1. We are still driving pilings for the foundation of the building. The large area the y are working on is the "core" of the building. It will support the elevator shaft the stairs. There are 2 of these cores in the second building. Due to the depth foundation dirt can only be removed 1 section at a time otherwise the crane would not be able to reach the middle. Everyone needs to work together at this stage for the job to run smoothly.