The interior pilings are driven grout as opposed to steel encased on the perimeter. The crane will have to come back in =to the site, since it has been dugout to a rocky base needs to be laid to support the massive weight of the pile driving crane. After the base is laid the crane can come in, it takes 2 days to assemble. We have started driving interior piles now and its full speed ahead.
The interior pilings are driven grout as opposed to steel encased on the perimeter. The crane will have to come back in =to the site, since it has been dugout to a rocky base needs to be laid to support the massive weight of the pile driving crane. After the base is laid the crane can come in, it takes 2 days to assemble. We have started driving interior piles now and its full speed ahead.