  1. Even though the building doesn't appear to be changing there is a lot of work going on inside. On each floor duct, pipe and wire is being run and the elevators are in full swing! If you look at the top of the building you can see that some steel has been installed. This assembly is the tower at the North end and above the main entrance. The next step is to install metal decking on top of this frame. Insulation will then be put on and covered with a water proof membrane and that will complete the tower roof.