Construction Photos Phase I - May 2011































1 comment:

  1. In this set of photos you can see the entire deck building process. Now that the building is above ground every floor is basically a repeat of the one below it. In the first photo the deck is complete and is poured. After the pour the columns and core walls are set and at the same time the deck below is being stripped and cycled up to the next floor. The core walls and columns need to be poured and stripped before the the entire deck can be built.