Construction Photos Phase II - July 2013



































1 comment:

  1. Even though not much has changed in these pictures there is still a lot of work going on. There is a lot of prep work involved with the 7th floor window system, some of it is the yellow sheeting you can see around the perimeter of the top floor. The same goes for the glass hand rail on the balconies on floors 4 & 7, which has metal cover that gets installed in several different pieces. We are working around the building installing brick on the West side of the building in preparation for the gas meter. Once we get the gas meter installed a lot of equipment and systems can begin testing.