Saturday, November 12, 2011

Pre-Construction Photos Phase II - October 2011









1 comment:

  1. The sheet piles are staged onsite. These will be the barrier the seperate the basement from the dirt on the outside of the building. You can see teh blue machine in some of the pictures. This machine grabs the piles and pushes them into the ground with hydrolics. It is very accurate, fast and quite.

    ReplyDelete